used 2027 BMW M5

2027 BMW M5

Touring
13 miles
Stock #13011
Price subject to change and verification.
Does not include tax, title and administrative fees.
MSRP
$134,925
Digital Display Price
$134,925

Questions?

1-336-760-7060
8AM - 8PM

Transmission

Automatic

Drivetrain

M xDrive all-wheel drive

Body Style

SUV




Vehicle Specs

MSRP $134,925
Color Marina Bay Blue Metallic
Mileage 13
Engine 8-cyl, Hybrid, 4.4L
Drivetrain M xDrive all-wheel drive
Transmission Automatic
Fuel Type Hybrid
Stock # 13011
VIN WBS83GV07VCY22837
CarID 813668
Dealership Flow BMW of Winston-Salem
Phone 800-467-5003
Store Hours Monday - Friday: 9:00am - 7:00pm
Saturday: 9:00am - 5:00pm
Sunday: Closed

Features

  • Wireless Apple CarPlay/Android Auto
  • Adaptive Cruise Control
  • Pedestrian Detection
  • Emergency Braking
  • Rear Camera
See More Features

Full Features

  • Technology and Telematics
  • Wireless Apple CarPlay/Android Auto
  • Optional Wi-Fi Hotspot
  • Integrated Navigation
  • 6 USB ports
  • Safety and Security
  • Adaptive Cruise Control
  • Pedestrian Detection
  • Rear Camera
  • Lane Departure System
  • Blind Spot Warning
  • Rear Collision Mitigation
  • Heads Up Display
  • Brake Assist
  • Driver Attention Warning
  • Forward Collision Warning
  • 360 View Camera
  • Auto High-Beam Headlights
  • Vehicle Tracking
  • Electronic Stability Control
  • Hill Start Assist
  • Parking Sensor
  • Running Lights
  • Rain Sensing Wipers
  • Side Airbags
  • Overhead Airbags
  • LED Headlights
  • ABS Brakes
  • Convenience
  • Emergency Braking
  • Cruise Control
  • Power Cargo Door
  • Virtual Assistant
  • Wireless Device Charging
  • Remote Start
  • Third Row Seating
  • Power Door Locks
  • Smart Key
  • Memory Seats
  • Comfort
  • Cooled Front Seats
  • Heated Steering Wheel
  • Heated Rear Seats
  • Heated Front Seats
  • Leather Seats
  • Rear Sun Blinds
  • Climate Control
  • Power Driver Seat
  • Power Passenger Seat
  • Folding Rear Seats
  • In-car Entertainment
  • Touchscreen
  • Bluetooth Connectivity
  • Premium Sound System
  • AM/FM Radio
  • Exterior and Appearance
  • Sunroof
  • Rear Spoiler
  • Powertrain and Mechanical
  • AWD
  • Turbo Charged Engine
  • Adjustable Suspension
  • Automatic Transmission
  • Traction Control

Similar Vehicles

WBS83GV07VCY22837 2027 BMW M5

2026 BMW X5 M

Digital Display Price: $144,800

WBS83GV07VCY22837 2027 BMW M5

2027 BMW X7

Digital Display Price: $125,450

WBS83GV07VCY22837 2027 BMW M5

2026 BMW X5 M

Digital Display Price: $141,400

Easy. Transparent. Fun.
WBS83GV07VCY22837 2027 BMW M5
2027 BMW M5 | Touring | 13 miles

Get Flow Price

Our digital display price is the lowest price we are able to display online. When you click Get Flow Price you will get our lowest price available.

Want to see every Flow price? Click Sign In and create an account.

Or

Tell us how to reach you and our Customer Relationship Center will get you the Flow Price, saving you money and time.

WBS83GV07VCY22837 2027 BMW M5
2027 BMW M5 | Touring | 13 miles

Book a VIP Appointment


Schedule a test drive from your home or at the store or purchase a new vehicle over the phone! Call 336-760-7060
Tell us how to reach you and our Customer Relationship Center will contact you, saving you money and time.


Preferred Date:
Preferred Time:
Preferred Contact Method:
Appointment Location:
WBS83GV07VCY22837 2027 BMW M5
2027 BMW M5 | Touring | 13 miles

Have a Question?


We’ve got a team of people who would love to help! Fill out the comments section below with your question and our Customer Relationship Center will help you find the answer!

WBS83GV07VCY22837 2027 BMW M5
2027 M5 BMW | Touring | 13 miles

Let’s Get Started with a VIP Appointment


We want you to have the best experience ever, which is why we created the VIP appointment process. Set up an appointment with our Customer Relationship Center and we’ll get everything ready for you!

Preferred Contact Method:
Appointment Preference:
QRP

Flow Quality Reconditioning Process

Got questions about how each car has been skillfully reconditioned so it's ready for you? We thought you might ask, that's why each car has it's own QRP history report that we include with every pre-owned vehicle.


WBS83GV07VCY22837 2027 BMW M5

Quality Reconditioning Process For This Vehicle:

2027 BMW M5

Touring
13 miles


Total Reconditioning Value ....................Contact Dealer

×