used 2025 BMW M3 Competition xDrive

2025 BMW M3

Competition xDrive Sedan
15,287 miles
Stock #12930A
Price subject to change and verification.
Does not include tax, title and administrative fees.
$89,899 Haggle-Free Market-Based Price

Questions?

1-336-760-7060
8AM - 8PM

Transmission

Automatic

MPG

16 cty | 23 hwy

Drivetrain

M xDrive all-wheel drive

Body Style

Sedan

Certification

Flow Certified

LOCAL TRADE **, GREAT SERVICE HISTORY **, HEATED AND COOLED SEATS **, SUNROOF / MOONROOF ** CLEAN ONE OWNER CARFAX!, EXECUTIVE PACKAGE, PARKING ASSISTANCE PACKAGE, DRIVING ASSISTANCE PROFESSIONAL PACKAGE, CARBON FIBER TRIM, M DRIVE PROFESSIONAL. REMAINDER OF FACTORY WARRANTY **,

This Vehicle is FLOW CERTIFIED AND comes with a 48 month/100K mile(Whichever Comes First) Powertrain Limited Warranty at no cost, 2 Free Maintenance Services within 2 years(whichever comes first) and a 3-day money back guarantee.

All of our Pre-Owned vehicles go through a QRP(Quality Renewal Process). Our customers tell us that we have the most professional, trustworthy & courteous staff they've ever experienced at a car dealership. Please come check out Flow BMW of Winston Salem's Easy, Transparent, Fun, No Haggle, No Pressure shopping experience. Don't hesitate to contact us at www.flowbmw.com or simply by calling 336-788-3333 to set up your VIP test drive. Thank you for allowing us to serve your automotive needs over the past 50+ years.

History and Reconditioning

QRP
Detail
QRP
Oil Change
QRP
New Tires
QRP
State Inspection
QRP
Pollen Filter
QRP
Alignment
Flow Certified

Flow Certified

We make every effort to ensure all reconditioning done to a vehicle is included in the QRP report. But it is possible, due to technical issues, that this may not be an exhaustive list of all the reconditioning performed to this vehicle. Also, we may have done more by the time someone comes to see the vehicle. Ask your local store for a complete reconditioning list while on your VIP appointment.




Vehicle Specs

Trim Competition xDrive
Color Dravit Grey Metallic
Mileage 15,287
Engine 6-cyl, Gas, 3L
Drivetrain M xDrive all-wheel drive
Transmission Automatic
Fuel Type Gas
Stock # 12930A
VIN WBS33HJ05SFU43769
CarID 815976
Dealership Flow BMW of Winston-Salem
Phone 800-467-5003
Store Hours Monday - Friday: 9:00am - 7:00pm
Saturday: 9:00am - 5:00pm
Sunday: Closed

Features

  • Wireless Apple CarPlay/Android Auto
  • Emergency Braking
  • Pedestrian Detection
  • Optional Wi-Fi Hotspot
  • Rear Camera
See More Features

Full Features

  • Technology and Telematics
  • Wireless Apple CarPlay/Android Auto
  • Optional Wi-Fi Hotspot
  • Integrated Navigation
  • 3 USB ports
  • Safety and Security
  • Emergency Braking
  • Pedestrian Detection
  • Rear Camera
  • Rear Collision Mitigation
  • Lane Departure System
  • Heads Up Display
  • Brake Assist
  • 360 View Camera
  • Blind Spot Warning
  • Auto High-Beam Headlights
  • Vehicle Tracking
  • Electronic Stability Control
  • Hill Start Assist
  • Parking Sensor
  • Running Lights
  • Rain Sensing Wipers
  • Side Airbags
  • Overhead Airbags
  • LED Headlights
  • ABS Brakes
  • Driver Attention Warning
  • Convenience
  • Adaptive Cruise Control
  • Cruise Control
  • Virtual Assistant
  • Wireless Device Charging
  • Remote Start
  • Power Cargo Door
  • Power Door Locks
  • Smart Key
  • Memory Seats
  • Comfort
  • Cooled Front Seats
  • Heated Steering Wheel
  • Heated Front Seats
  • Leather Seats
  • Climate Control
  • Power Driver Seat
  • Power Passenger Seat
  • Folding Rear Seats
  • In-car Entertainment
  • Touchscreen
  • Bluetooth Connectivity
  • Premium Sound System
  • AM/FM Radio
  • Auxiliary Audio Input
  • Exterior and Appearance
  • Sunroof
  • Rear Spoiler
  • Powertrain and Mechanical
  • AWD
  • Turbo Charged Engine
  • Adjustable Suspension
  • Automatic Transmission
  • Traction Control

Why Buy a Pre-Owned Vehicle from Flow?

We think buying a car or truck should be an enjoyable experience!

100,000 Mile Warranty
100,000 Mile Warranty
Low, No-Haggle Prices
Low, No-Haggle Prices
Quality Renewal Process
Quality Renewal Process
3 Day/300 Mile Money Back Guarantee
3 Day/300 Mile Money Back Guarantee
2 Years Maintenance At No Charge
2 Years Maintenance At No Charge

Similar Vehicles

WBS33HJ05SFU43769 2025 BMW M3 Competition xDrive

2026 Mercedes-Benz E 350

Digital Display Price: $81,230

WBS33HJ05SFU43769 2025 BMW M3 Competition xDrive

2026 Ram 2500

Digital Display Price: $81,432

WBS33HJ05SFU43769 2025 BMW M3 Competition xDrive

2027 BMW 5 Series

Digital Display Price: $84,915

WBS33HJ05SFU43769 2025 BMW M3 Competition xDrive

2027 BMW 5 Series

Digital Display Price: $87,115

WBS33HJ05SFU43769 2025 BMW M3 Competition xDrive

2026 Mercedes-Benz E 450

Digital Display Price: $82,770

Easy. Transparent. Fun.
WBS33HJ05SFU43769 2025 BMW M3 Competition xDrive
2025 BMW M3 | Competition xDrive Sedan | 15,287 miles

Get Flow Price

Our digital display price is the lowest price we are able to display online. When you click Get Flow Price you will get our lowest price available.

Want to see every Flow price? Click Sign In and create an account.

Or

Tell us how to reach you and our Customer Relationship Center will get you the Flow Price, saving you money and time.

WBS33HJ05SFU43769 2025 BMW M3 Competition xDrive
2025 BMW M3 | Competition xDrive Sedan | 15,287 miles

Book a VIP Appointment


Schedule a test drive from your home or at the store or purchase a new vehicle over the phone! Call 336-760-7060
Tell us how to reach you and our Customer Relationship Center will contact you, saving you money and time.


Preferred Date:
Preferred Time:
Preferred Contact Method:
Appointment Location:
WBS33HJ05SFU43769 2025 BMW M3 Competition xDrive
2025 BMW M3 | Competition xDrive Sedan | 15,287 miles

Have a Question?


We’ve got a team of people who would love to help! Fill out the comments section below with your question and our Customer Relationship Center will help you find the answer!

WBS33HJ05SFU43769 2025 BMW M3 Competition xDrive
2025 M3 BMW | Competition xDrive Sedan | 15,287 miles

Let’s Get Started with a VIP Appointment


We want you to have the best experience ever, which is why we created the VIP appointment process. Set up an appointment with our Customer Relationship Center and we’ll get everything ready for you!

Preferred Contact Method:
Appointment Preference:
QRP

Flow Quality Reconditioning Process

Got questions about how each car has been skillfully reconditioned so it's ready for you? We thought you might ask, that's why each car has it's own QRP history report that we include with every pre-owned vehicle.


WBS33HJ05SFU43769 2025 BMW M3 Competition xDrive

Quality Reconditioning Process For This Vehicle:

2025 BMW M3

Competition xDrive Sedan
15,287 miles

QRP
Detail
QRP
Flow Certified
QRP
Oil Change
QRP
New Tires
QRP
State Inspection
QRP
Pollen Filter
QRP
Alignment

Total Reconditioning Value ....................$3,785

×