Features
- Wireless Apple CarPlay/Android Auto
- Emergency Braking
- Pedestrian Detection
- Optional Wi-Fi Hotspot
- Rear Camera
Full Features
- Technology and Telematics
- Wireless Apple CarPlay/Android Auto
- Optional Wi-Fi Hotspot
- Integrated Navigation
- 2 USB ports
- Safety and Security
- Emergency Braking
- Pedestrian Detection
- Rear Camera
- Lane Departure System
- Blind Spot Warning
- Brake Assist
- Rear Collision Warning
- 360 View Camera
- Auto High-Beam Headlights
- Vehicle Tracking
- Electronic Stability Control
- Hill Start Assist
- Parking Sensor
- Running Lights
- Rain Sensing Wipers
- Side Airbags
- LED Headlights
- ABS Brakes
- Driver Attention Warning
- Convenience
- Cruise Control
- Virtual Assistant
- Wireless Device Charging
- Remote Start
- Power Cargo Door
- Power Door Locks
- Smart Key
- Memory Seats
- Comfort
- Cooled Front Seats
- Heated Steering Wheel
- Heated Front Seats
- Leather Seats
- Climate Control
- Power Driver Seat
- Power Passenger Seat
- Folding Rear Seats
- Exterior and Appearance
- Convertible Roof
- Soft Top
- In-car Entertainment
- Touchscreen
- Bluetooth Connectivity
- Premium Sound System
- AM/FM Radio
- Powertrain and Mechanical
- AWD
- Turbo Charged Engine
- Adjustable Suspension
- Automatic Transmission
- Traction Control


































